Pages

Tuesday, March 31, 2015

Kitchen Progress III

WEEK THREE

Included:
  • Sanding, priming and painting
  • building an upper cabinet and the big pantry cabinet
  • Plumbing for the new sink and our (EEE!!!) dishwasher!
  • Ripping out the second side of base cabinets and prepping for drywall
My temporary kitchen in the dining room.
This is what has saved my sanity. A sheet of poly with a zipper. It has kept most of the dust out of my house, even that nasty plaster and drywall dust!
Trust me, it was not usually this clean.
First upper cabinet hung!
Before the demo of the second side.
 
Our happy helper and other sanity saver with those cheeky grins of his!


No comments:

Post a Comment